As safety requirements increase, and on site personnel requirements begin to decrease as one in the same.
As safety requirements increase, and on site personnel requirements begin to decrease as one in the same.
TAQA is taking a proactive approach by establishing 24 hour – real time directional drilling, measurements and drilling engineering centers that work with the team on the rig site from afar, troubleshooting problems that would have required personnel to travel to the site and spend time working directly on location, both of which are time consuming and increase exposure to safety hazards. These centers maximize operational efficiency and allow real-time troubleshooting of issues at the rig site to minimize downtime for the operator.